project duration造句
例句與造句
- The forecast technology of project duration
項目工期預測技術。 - The sequence in which tasks occur can affect the project duration
任務的先后順序會影響項目的工期。 - Research on engineering project duration risk based on fuzzy network
基于模糊網(wǎng)絡的工程項目工期風險評估研究 - Shortening the duration of a critical task can shorten the project duration
縮短關鍵任務的工期可以縮短整個項目的工期。 - The timing and sequence of tasks within a project , as well as the project duration
項目和項目工期中任務的時間安排及先后次序。 - It's difficult to find project duration in a sentence. 用project duration造句挺難的
- Or , if your project duration is very short , you might have little time or need to track tasks
或者,如果項目的工時非常短,就可能沒有時間或必要對任務進行跟蹤。 - These latter two types of links automatically overlap tasks , which tends to decrease the overall project duration
后兩種鏈接類型自動地重疊任務,這將趨于縮短項目的總工期。 - In one stroke , you can shorten the project duration , reduce the number of required resources , and slash costs
這種改變可以縮短項目的工期,減少所需的資源數(shù)量,以及削減成本。 - An effective way , then , to decrease the project duration is to look for instances where you can replace fs links with either ss or ff links
因此,縮短項目工期的一個行之有效的方法就是:查找可以將fs鏈接替換成ss或ff鏈接的情況。 - To develop a localised discrimination measurement by modifying the protocol developed by the unaids with data collected . project duration : 1 october 2001 to 1 august 2002
改良聯(lián)合國愛滋病規(guī)劃署制定的準則,并?集有關資料,以訂定評估本港歧視情況的方法。 - Construct scenario with a public health perspective to provide solid ground for directing , designing and evaluating targeted prevention and care programmes . project duration : 1 august 2000 to 31 july 2001
從公共生角度,假設某個可能出現(xiàn)的情況,并訂出愛滋病預防和照顧的重點工作計劃,以及督導設計和評估有關工作的方法。 - However , by switching furniture arranging ( which does n ' t depend on the walls being dry ) to tuesday and hanging clocks to wednesday , the project stays on schedule , without wasting days or possibly increasing the project duration . .
然而,通過將家具布置(它不依賴于墻是否干燥)調(diào)換到周二,懸掛鐘表調(diào)換到周三,就可以保證遵循項目的日程,而不會浪費時間和增加工期。 - The project aims to gain and share experience in the operations and developments of local and international programmes including recommending appropriate measures and giving advice on the effective running of the local or international centre , i . e . the unaids collaborating centre and the red ribbon centre for the benefit of the local public and the neighbouring region . project duration : 23 - 27 october 1999 completed
本計劃旨在汲取并分享在本港和國際間推行和發(fā)展愛滋病計劃的經(jīng)驗,包括就如何妥善管理本港或國際的愛滋病中心即紅絲帶中心和聯(lián)合國愛滋病規(guī)劃署合作中心提出意見和提議合適的措施,讓本港和鄰近地區(qū)的居民受惠。 - By analyzing group of data , appropriate statistics , such as distribution and average of activity duration , distribution and average of project duration , etc were gained which can be used to determine a reasonable and executable schedule considering influence of random factors
運用這些模型在計算機上進行仿真試驗,得到一組工作時間參數(shù)的樣本值,通過對這組樣本值的統(tǒng)計分析,得到在隨機因素影響下工作持續(xù)時間的變化趨勢和平均值、項目工期的變化趨勢和平均值等參數(shù)值,從而為科學地進行進度管理提供依據(jù)。